Sunday 19 May 2013


The beginning of May was flat out with the major project being the press Junket for the premier of fast & furious 6. Astral stepped into the breach to produce 7 custom structures to be deployed as camera overhangs for the shoot featuring wide shots of the London skyline for the interviews. The custom builds we individual designed to fit each balcony location on the 13th & 15th floors of the park Plaza hotel Westminster. It was not on the movie that was fast & furious on this particular occasion.

No comments:

Post a Comment